Battery interface control modules are the satellite boards in the traction battery that measure cell voltages and temperatures and report them to the battery energy control module. P2C8A says module A is reachable but not working properly. GM uses the code on its Ultium EVs: preliminary information PIP6021 (Lyriq, Blazer EV, Equinox EV, later Optiq and Vistiq) blames a BECM calibration anomaly when P2C8A, P2C8B and U3577-U35AF are all set, with MIL or Service High Voltage and a draining 12 V battery; the fix is BECM programming and two manual resets. PIP6081 calls the same pattern a cell monitoring unit brownout on Hummer EV, Silverado EV and Escalade IQ. The earlier Volt checked comparable modules with its own code, a key value test, Type B.
Possible causes
- Battery energy control module software or calibration error high
- Supply dip at the cell monitoring module (12 V battery weak, wake-up issue) medium
- Damaged communication or supply harness inside the battery pack low
- Failed interface module A board low
Symptoms
- MIL or Service High Voltage message
- 12 V battery discharging while parked
- Many battery communication codes stored at the same time
Inspection / repair
- Difficulty: shop only
- DIY: shop recommended
What Pro shows you for P2C8A
Before you go to the garage: roughly what the repair costs, how long it takes and which components are involved.
- Repair cost (estimate)(visible in Pro mode)
- Labour time(visible in Pro mode)
- 2 affected components(visible in Pro mode)
- 3 warnings for driving and inspection(visible in Pro mode)
See repair cost, labour time and components?