P2A99
Alternative Fuel Tank Select Valve C Control Circuit/Open
P2A99 belongs to installations with at least three selectable vessels or supplies and reports an open or otherwise broken control circuit at select valve C. Published designs mostly show two vessels, such as Westport's LNG arrangement with one pump and a valve choosing the tank, or Cespira's pair of compressed-gas supplies; a third valve extends the same principle. With valve C unpowered, its vessel can neither be brought on line nor, depending on the rest position, taken off line, so the selection sequence breaks at that point. Take care not to confuse it with P2A26, the shutoff solenoid on tank C, or with the hydraulic pump select valve. No manufacturer documents P2A99. Check the plug, the lead and the coil of valve C.
Possible causes
- Disconnected plug or broken lead at select valve C high
- Coil of valve C burnt out medium
- Module output for valve C failed low
Symptoms
- Malfunction lamp on
- Third vessel stays full or is never isolated
- Total range reduced
Inspection / repair
- Difficulty: hard
- DIY: shop recommended
What Pro shows you for P2A99
Before you go to the garage: roughly what the repair costs, how long it takes and which components are involved.
- Repair cost (estimate)(visible in Pro mode)
- Labour time(visible in Pro mode)
- 3 affected components(visible in Pro mode)
- 3 warnings for driving and inspection(visible in Pro mode)
See repair cost, labour time and components?
One key opens all tools by Fabian Brose.