P0B40
Hybrid/EV Battery Voltage Sense B Circuit
P0B40 is the circuit code of cell voltage sense channel B, the second cell or cell group the battery monitoring electronics measures; pack-level voltage uses P0ABA and P0B14 ff instead. GM applies the same open sense line test as on channel A: a 1.3 V jump between neighbouring cells, under 36 mV with balancing on, or splice voltage above 0.1 V (bus bar 0.5 V) for 0.6 s, Type A, one trip. Ford lists P0B40 among the open-line codes on the 2019-2020 Fusion PHEV, where the fix is a new traction battery, and on the 2023 Mustang Mach-E and e-Transit, where an intermittent flexible printed circuit cable in the battery controller is to blame. Expect no start or no charging.
Possible causes
- Open cell sense line, splice or bus bar connection inside the pack high
- Intermittent flexible printed circuit cable in the battery controller (Ford Mach-E, e-Transit) medium
- Internal traction battery failure requiring replacement (Ford Fusion PHEV) medium
Symptoms
- Wrench indicator or MIL, Stop Safely Now message possible
- No start condition
- Battery cannot be charged
Inspection / repair
- Difficulty: shop only
- DIY: shop recommended
What Pro shows you for P0B40
Before you go to the garage: roughly what the repair costs, how long it takes and which components are involved.
- Repair cost (estimate)(visible in Pro mode)
- Labour time(visible in Pro mode)
- 3 affected components(visible in Pro mode)
- 3 warnings for driving and inspection(visible in Pro mode)
See repair cost, labour time and components?
One key opens all tools by Fabian Brose.